Project
Description and Objectives:
The project aims at eliminating poverty, improving the economic conditions of
the inhabitants who work in seasonal agricultural and pasturing activities and
providing new job opportunities through the construction of a fully integrated
project for the production of sugar, energy, fodders and other food, vegetation
and animal product. The project includes the following components:
a. Irrigation channels: this includes the construction of a main earth channel with
a length of 20 km. Three main channels shall branch from it to supply water to
the channels irrigating fields. The area of a field ranges from 60 to 81
hectares. Water needs are estimated at 55 M3 per second to be pumped from the Blue
Nile by two pumping plants.
b. Cultivation of an area of land of 52,650 hectares out of which
42,525 hectares shall be allocated for sugarcane, 8100 hectares for
cash-generating crops sunflower, corn and sesame and 2,025 hectares for forests.
c. Civil works for the sugar factory.
d. Provision of machinery and equipment of the factory including
diesel generators plant, power conversion plant, high voltage lines, two steam
turbine plants, plant of cane reception and extraction of juice.
e. Pre-operation costs.
f. Possession of lands and settlements including cash and in-kind
compensations for the 70,000 inhabitants of the area and relocated them in about
34 Villages.
|