    Senegal

Project (1)

 

Project                 : Dalal Jamm Hospital

Total Cost

:

SR. 222.40 million

SFD’s Contribution

:

SR. 54.50 million

Date agreement Signed

:

08/01/2007

Estimated Completion Date

:

End of 2009

Executing Agency

:

 Directorate of Dalal Jamm Hospital project

 Project Description and Objectives :

     The project's aim is to establish a new hospital in the Dalal Jamm suburb of Dakar (the capital city), to provide advanced medical services which the country most needs. The hospital initial capacity is 300 beds can be expanded to 500 beds in the future. The hospital will be established in accordance with the highest technical specifications and furnished with the most modern medical equipments to be in a position to provide remedial services to attract patients from the West Africa region. The project is to be built on a land of 10 hectares; with the premises occupying 26, 575 square meters. The 4-storey building consists of several sections including: inpatient units section, specialized clinics section, cancer section, dialysis section, emergency section, intensive care section and the medical imaging and laboratory section.



Project (2)
 

 

Project                 : Medina Gounass - Guinea's borders Road

Total Cost

:

SR. 85.50 million

SFD’s Contribution

: SR. 37.50 million

Date agreement Signed

:

21/03/2007

Estimated Completion Date

: Mid of 2009

Executing Agency

: Roads Construction Agency

 Project Description and Objectives :

     The Project is a part of a program that the governements of Senegal and Guinea plan to implement for land linkage between them.  It is an important linking part of the inter-state road that will be constructed for this specific purpose. The project facilitates inhabitants and goods movement; promotes trade exchange and enhances Senegal-Guinea economic integration. The length of the road to be paved is 70 kilometers, 7 meters width and 1.5 meters shoulder on both sides .



Project (3)

 

Project                 : Ouakam Road in Dakar

Total Cost

:

SR. 500.00 million

SFD’s Contribution

: SR. 114.00 million

Date agreement Signed

:

21/03/2007

Estimated Completion Date

: Mid of 2008

Executing Agency

: The National Agency of the Islamic Conference Organization

 Project Description and Objectives :

     The Ouakam road project is part of a program to streamline traffic between the center of the capital and its suburbs. The project is considered a backbone road for traffic movement in the capital center. It is a central road from which traffic movement diverts to the western corniche road and the road that exit the traffic to the north. The project contributes to the capital's urban development; shortens the time consuming; lowers vehicles operational costs; reduces pollution and ensures inhabitants traffic safety. The road is 6.44 kilometers length, of which 5.34 kilometers is two lanes on each direction, and the remaining 1.10 kilometers is single lane road.  It will be supported by necessary connections to link it with other roads, that are seven circle-shaped intersections and three 2-level car intersections, together with pedestrian corridors, sidewalks and water drainage channels .